Taltson hydro shutdown set

172
The Northwest Territories Power Corporation (NTPC) has announced a shutdown of the Taltson hydro power plant. According the power corp., the shutdown is planned to begin at 8 a.m. on Oct. 12 and end at 6 p.m. that day so maintenance can be carried out on a transmission line. During the shutdown, Hay River, Fort...